Mechanical services offered by CMS include:

  • HVAC/Plumbing
  • Installations, Repairs and Alterations
  • Equipment Rigging and Installation
  • Steel Fabrication and Installation
  • Boiler Alterations and Installation
  • Chilled Water Fabrication and Installation
  • Hydronic System Installations, Repairs and Alterations
  • Process Pipe Fabrication and Installation
  • Welding (carbon steel, stainless steel, aluminum, inconel and monel)
  • Cleaning, Testing and Inspection

Replace HTHW from HP-1 to Pinion Drive

Client: TolTest, Inc.
Location: USAFA, CO
Value: $2,016,870
Completion Date: August 2008
CMS provided all concrete penetrations for the new pipe installation; conducted hydrostatic testing; removed and disposed of all interior hydronic piping and associated fittings; removed and disposed of all piping inside exterior concrete vaults; provided and installed all interior piping, fittings, valves, sleeves, link seals, supports and associated items for the new hydronic piping system; installed temperature control devices and flow meters, pumps, motors and variable frequency drives; provided shop drawings and anchor bolts for new pump housekeeping pads; …

Ozone Piping

Client: Reynolds
Location: Indianapolis, IN
Value: $1,933,370
Completion Date: May 2007
CMS provided and installed oxygen, ozone and chilled water pipe and fittings; provided the labor to pneumatically test newly installed piping systems; provided oxygen cleaning of stainless steel piping; installed inline flow meter devices; provided and installed a branch connection or O-let for the instrumentation devices; and installed valves. The deck mechanical work included the installation of expansion joints, flow meter, isolation valves and purge ports in the main supply lines and valves at the feed structures.

Re-Route Ash Piping

Client: USAF
Location: Wright-Patterson AFB, OH
Value: $812,443
Completion Date: October 2008
CMS demolished 24 feet of 84" x 36" ductwork to three boilers; abated the lead paint on the hoppers; cut away an 18' x 3' section from each of the hopper bottoms and outlet assemblies; and removed the refractory insulation, existing piping, and overfire fan power panels/conduit. CMS then rebuilt the three hopper bottoms with 1/4" steel plate and installed new refractory block insulation. CMS fabricated 15 new 1-1/2' x 1-3/4' x 1' hopper outlet assemblies from 3/8" steel plate and connected them to the hopper bottom with 15 new 8" knife gate valves. Once the …

Replace Steam/Condensate Lines

Client: USAF
Location: Wright-Patterson AFB, Dayton, OH
Value: $608,347
Completion Date: June 2007
The project entailed removing the old steam pipe and replacing it with new pipe in phases and sections. After excavation, asbestos abatement was completed, allowing the existing steam piping and concrete slab to be removed. CMS started the work for the cast-in-place concrete that formed the new 230' shallow trench. While the concrete was being installed, CMS fabricated and installed the steel structures every 15' for the full length of the shallow trench. Three new lines totaling 675 LF of carbon steel A53 schedule 80 pipe was installed. Upon completion of the …

North Campus Steam Expansion Heating Plant

Client: Purdue University
Location: West Lafayette, IN
Value: $411,167
Completion Date: October 2007
This project included the replacement of 8" and 12" high-pressure steam piping with 18" high-pressure steam piping from Heating Plant North to Stadium Mall Fountain. This included the removal of existing pipe, expansion joints and anchors; the installation of new expansion joints, valves, anchors, guides and supports; and the installation of 18" rotary shut-off valves (butterfly valves). Also included were high-pressure steam and condensate piping connections to existing systems.